Manage Page Editor UDQ line chart widgets
The UDQ line chart widget shows the volume and status of running jobs over time to identify load issues or failures. In the widget, you can configure what information is shown to a user, for example you can specify the total job runs over the selected time range, grouped by status.
Prerequisites
You have the required permissions to edit the product page or dashboard.
Steps
- Go to the page where you want to add or edit a UDQ line chart widget.
- Click Edit.
- Place the widget:
- If this is a new widget, under Widgets, drag and drop UDQ line chart to the desired row on the page.
- If this is an existing widget, select the existing UDQ line chart widget and drag and drop it to the new position on the page.
- Select the UDQ line chart widget you want to configure.
- In the right-side Pages panel, update the widget details:
- In Title, enter the name of the widget.
- In Description, enter a description of the widget.
- Select the Show description in a tooltip checkbox to show the description in a tooltip. This helps consolidate space on your page.
- Select the Data source:
- Coverage over time - The coverage % trend over the selected date range, multi-lined by connection.
- Job run status over time - The total job runs over the selected time range, grouped by status (Success, Error, Cancelled).
- Data quality trends - The trend of the Overall score and individual Dimension scores over the selected date range.
- In Refresh level, select how often you want the counter data to be refreshed:
- No refresh: The data is not refreshed, and the information remains static from the time you publish the page.
- 5 minutes
- 10 minutes
- 25 minutes
- 50 minutes
- 100 minutes
Toggle on the Remove border and padding field to reduce the padding around the widget.
- Optionally, select
above the component to copy and paste the component.
- Optionally, select
above the component to delete the component. - Click Publish to publish your changes.