Synchronize SAP AI Core
Synchronizing SAP AI Core is the process of integrating metadata from SAP AI Core and making the data available in Collibra Platform.
You can synchronize manually, or you can automate it by adding a synchronization schedule.
Before you begin
- You have created a SAP AI Core connection.
- You have added the SAP AI Core capability to the SAP AI Core connection.
Required permissions
- You have a resource role with the Configure external system resource permission, for example, Owner.
- You have a global role with the Catalog global permission, for example, Catalog Author.
- You have a global role with the View Edge connections and capabilities global permission, for example, Edge integration engineer. For example, Edge integration engineer.
Steps
- Manually synchronize SAP AI Core
- Add a synchronization schedule
-
On the main toolbar, click
→
Catalog.
The Data Catalog Home opens. -
On the main toolbar, click
.
The Create dialog box appears. - In the Register with Edge section of the Create dialog box, click Integration Configuration.
The Integration Configuration page opens. - In the Connection name column, locate the SAP AI Core connection that you used when you added the SAP AI Core capability and click the link in the Capabilities column.
The Synchronization page opens. - In the Synchronization Configuration section, click Add Configuration.
- In SAP AI Core domain, select the domain asset in which you want to add the SAP AI Model assets.
- In SAP AI Core Resource Groups, select and add the resource groups that you want to ingest.
- Click Save.
- Click Synchronize.
A notification indicates the synchronization has started.
-
On the main toolbar, click
→
Catalog.
The Data Catalog Home opens. -
On the main toolbar, click
.
The Create dialog box appears. - In the Register with Edge section of the Create dialog box, click Integration Configuration.
The Integration Configuration page opens. - In the Connection name column, locate the SAP AI Core connection that you used when you added the SAP AI Core capability and click the link in the Capabilities column.
The Synchronization page opens. - In the Synchronization Configuration section, click Add Configuration.
- In SAP AI Core domain, select the domain asset in which you want to add the SAP AI Model assets.
- In SAP AI Core Resource Groups, select and add the resource groups that you want to ingest.
- Click Save.
- In the Synchronization Schedule section, click Add schedule.
- Enter the required information and click Save:
Field Description Repeat The interval when you want to synchronize automatically. The possible values are: Daily, Weekly, Monthly, and Cron expression. CronThe Quartz Cron expression that determines when the synchronization takes place.
This field is only visible if you select
Cron expression
in the Repeat field.EveryThe day on which you want to synchronize, for example, Sunday.
This field is only visible if you select
Weekly
in the Repeat field.Every firstThe day of the month on which you want to synchronize, for example, Tuesday.
This field is only visible if you select
Monthly
in the Repeat field.At
The time at which you want to synchronize automatically, for example, 14:00.
- You can only schedule on the hour. For example, you can add a synchronization schedule at 8:00, but not at 8:45.
- This field is only visible if you select
Daily
,Weekly
, orMonthly
in the Repeat field.
Time zone The time zone for the schedule.
What's next?
The synchronization job synchronizes the SAP AI Core data.
After the synchronization:
- You can view a summary of the results from the Activities list.
- The resulting assets get a relation to the Domain that you selected.
For information on the integrated data, go to Synchronized SAP AI Core data.