Edit a Tableau synchronization schedule
You can edit the synchronization schedule of a Tableau Server asset. For example, you can do this if you think the synchronization job runs too often or not often enough.
Prerequisites
- You have a resource role with the Configure external system resource permission, for example Owner.
- You have a global role with the Catalog global permission, for example Catalog Author.
- You have registered Tableau.
- You have connected a Tableau Server asset to a Tableau Server or Tableau Online.
- You have added a synchronization schedule.
Steps
- Open a Tableau Server asset page.
-
In the tab pane, click
Configuration. - In the Synchronization schedule section, click Edit Schedule.
- Enter the required information.
Field Description Repeat The interval when you want to synchronize automatically, for example daily, weekly or based on a Cron expression. CronThe Quartz Cron expression that determines when the synchronization takes place.
This field is only visible if you select
Cron expressionin the Repeat field.EveryThe day on which you want to synchronize, for example Sunday.
This field is only visible if you select
Weeklyin the Repeat field.Every firstThe day of the month on which you want to synchronize, for example Tuesday.
This field is only visible if you select
Monthlyin the Repeat field.AtThe time at which you want to synchronize automatically, for example 14:00.
This field is only visible if you select
Daily,WeeklyorMonthlyin the Repeat field.Time zone The time zone for the schedule. - Click Save.